Difference between revisions of "Jurassic Park (1993 Film)/Locations"
Jump to navigation
Jump to search
Line 293: | Line 293: | ||
| | | | ||
|- | |- | ||
− | |14 | + | |rowspan="9"|14 |
− | |Int. | + | |rowspan="9"|Int. |
− | |[[Maintenance Shed (Set)|Maintenance Shed]] | + | |rowspan="9"|[[Maintenance Shed (Set)|Maintenance Shed]] |
− | |[[Stage 23]] at [[Universal Studios]] | + | |rowspan="9"|[[Stage 23]] at [[Universal Studios]] |
+ | |rowspan="9"|[[John Berger]] | ||
+ | |rowspan="2"|1 | ||
+ | |Plan (Version 1) | ||
| | | | ||
| | | | ||
+ | |- | ||
+ | |Plan (Version 2) | ||
| | | | ||
+ | | | ||
+ | |- | ||
+ | |2 | ||
+ | |Section thru CL Elevs A, B, K, L & M | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |3 | ||
+ | |Elevations C, D, E, F, G, H, I, J, O & P | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |4 | ||
+ | |Fl. Treatment & Reflected Ceiling | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |5 | ||
+ | |Fl. & Ceiling Pipe/Hardware Layout | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |6 | ||
+ | |Pipe Layout Elev. A, B, K, L & M | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |7 | ||
+ | |Pipe Layout Elev. C, D, E, F, G, H, I, J, O & P | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |8 | ||
+ | |Panel Layout | ||
| | | | ||
| | | |
Revision as of 13:31, 23 March 2022
Locations
Set Blueprints
Set No. | Int./Ext. | Name | Location | Set Designer | Sheet | Name | Detail | Description |
---|---|---|---|---|---|---|---|---|
01 | Int. | Visitors' Center Rotunda | Stage 12 at Universal Studios | Paul Sonski | 1 | First Floor Plan | ||
2 | Second Floor Plan | |||||||
1st Floor - Reflected Ceiling Plan | ||||||||
1/4" Elevations - Restaurant (Cafeteria) | ||||||||
1st Floor Tile Pattern | ||||||||
Masako Masuda | Giftshop 1 of 2 | 15 | Gift Shop & Cases | |||||
Giftshop 2 of 2 | ||||||||
04 | Int. | Control Rm & Lab | Stage 28 at Universal Studios | Lauren Cory | 1 | Master Ground Plan | ||
2 | Scaffold Plan | |||||||
3 | Flooring Plan | |||||||
Lauren Cory | 4 | Reflected Ceiling Plan | ||||||
5 | Elevations A thru H | |||||||
6 | Elevations I thru M | |||||||
7 | Control Rm. Ceiling Dets | 1 | Beams & Soffit Plan | |||||
8 | Beams & Soffit Dets. | |||||||
9 | 2 | Railings | ||||||
10 | 3 | Prop Ceiling in Con. Rm. | ||||||
11 | Elev. B | 4 | 5' Dia. Windows in Con. Rm. | |||||
12 | 5 | Entrance Drs. Con. Rm. | ||||||
13 | 6 | Columns in Con. Rm. | ||||||
14 | Elev. A & C | 7 | Applied Panels Elev. A | |||||
15 | Elev. A | 8 | Door w/ Stone Frame | |||||
16 | Elev. A & C | 9 | CM-5 Computer Housing | |||||
17A | Elev. M & F | 10 & 11 | Windows Between Computer R. & Tour | |||||
17B | ||||||||
18A | Elev. G & I | 12 | Stairway, Grate & Pipe | |||||
CJ Stensel | 18B | |||||||
Masako Masuda | 19A | Elev. H, K & L | 13 | Airtight Doors & Decontam. Rm. | ||||
19B | ||||||||
20 | Elev. J | |||||||
21 | ||||||||
22 | ||||||||
23 | ||||||||
24 | 15 | Rail & Stairs in Labs | ||||||
25 | ||||||||
26 | Elev. I | 16 | Soffit & Walkway in Labs | |||||
27 | Stair to Garage | 17 | Enlarged Plan | |||||
28 | Rotating Tour Room | 18 | Plan & Elevations | |||||
29 | 19 | Details Rotat. Tour Room Rail | ||||||
07 | Int. | Kitchen | Stage 24 at Universal Studios | John Berger | 1 | Plan | ||
2 | Spotting Plan - Decks | |||||||
3 | Elev. A, B, C, D, E, F, G, H | |||||||
4 | Elev. I, J, K, L | |||||||
5 | Reflected Ceiling | |||||||
6 | Floor Treatment | |||||||
7 | Kitchen Prep Tbl & Unit Layout | |||||||
8 | Mirror Gag Counter & Hideaway | |||||||
11 | Ext. | Embankment | Stage 27 at Universal Studios | Masako Masuda | 1 | Elevation & Plan | ||
2 | Culvert Wall | |||||||
3 | Revised Fence Post Detail | |||||||
14 | Int. | Maintenance Shed | Stage 23 at Universal Studios | John Berger | 1 | Plan (Version 1) | ||
Plan (Version 2) | ||||||||
2 | Section thru CL Elevs A, B, K, L & M | |||||||
3 | Elevations C, D, E, F, G, H, I, J, O & P | |||||||
4 | Fl. Treatment & Reflected Ceiling | |||||||
5 | Fl. & Ceiling Pipe/Hardware Layout | |||||||
6 | Pipe Layout Elev. A, B, K, L & M | |||||||
7 | Pipe Layout Elev. C, D, E, F, G, H, I, J, O & P | |||||||
8 | Panel Layout | |||||||
17 | Int. | Trailer | Stage 36 at Universal Studios | |||||
41 | Ext. | Helipad Gate | Manawaiopuna Falls, Kauai | |||||
50 | Ext. | Visitors' Center | Valley House Plantation Estate | |||||
54 | Ext. | Raptor Pen | National Tropical Botanical Garden | |||||
55 | Ext. | Maintenance Shed | National Tropical Botanical Garden | |||||
67 | Ext. | T-Rex Paddock | Waikoko Forest Management Road | |||||
72 | Ext. | Motion Sensor | Kauai | |||||
Ext. | Main Road | Stage 16 at Warner Bros. |